Russia Life04tcy/ros/000xx progress Report №2 from 01. 07. 05 to 15. 01. 06 Date of the submission of the report: 20. 01. 06


Скачать 373.6 Kb.
НазваниеRussia Life04tcy/ros/000xx progress Report №2 from 01. 07. 05 to 15. 01. 06 Date of the submission of the report: 20. 01. 06
страница9/15
ТипДокументы
1   ...   5   6   7   8   9   10   11   12   ...   15

Future plan


Task 2 has been almost finished except the Information Strategy; Thomas should keep in contact with JP. Houix and the IS should be ready to be sent by the beginning of the January. Task 2.3: Information Strategy to be provided by the end of November.
      1. Task 3: Data identification and elaboration of meta-data catalogue


Thomas to make a paper about information available by the working group by the beginning of January. Data available by the users is usually not reliable (E, Titova). JP. HOUIX to send the subset of the ISO on metadata Only a draft of the information strategy will be attached to the January report and finalised during the next meeting for project implementation (23th - 27th of January).

Task 3.1: local expert will gather metadata according to a scheme provided by EU expert;

Task 3.2: EU-Local expert;

Task 3.3: EU-Local expert;

Task 3.4: EU-Local expert;

Task 3.5: Local expert and sub-contractors.

Data catalogue will be discussed during next meeting. Task 3: visit in France to see how metadata are used in France.
      1. Task 4: Geographic Information System


To be discussed in working group.
      1. Task 5: Environmental assessment and reporting for decision-making


Study visit in May in Finland to deal with indicators. Turku will take part in this phase to assist in building environmental indicators.

5.3 Relational database: Finland, local experts, and EU experts;

5.4 Targeted information: all partners.
      1. Task 6: Training


Training to be conducted in June.

Task 6.1: Meta-information systems (MIS);

Task 6.2: GIS and Information tools;

For the training session a draft user manual should be prepared.

Terms of references to be prepared as soon as possible; with two proposals from different companies at least. Make terms of Reference for 8,000 euros and metadata elaboration. Transfers should be split into 2 transfers of less than 5,000 euros each. No advance payment should be foreseen at all. Foresee 2 tasks.

Get information from CEBANOR to know how and when they can participate; in case it's not possible, ask authorisation to use money for Hamburg travel.

Next Steering Committee will take place in beginning of 3rd-7th July 2006. All participants should provide by that time all expenses proves and required documents requested for the interim report.
Annex 7




Information and Communication Technologies to Strengthen Sustainable City Management

InfoCoSM 




Working plane

for the next reporting period


Task

Dead Line

Responsible

Budget (euros)

Task 3: Development of on-line access to metadata catalogue:

November 2006

Ladoga Telecom

2,000

Task 3: Introduction to ISO 19115, terms of references for the development of MIS

March 2006

subcontractor

4,000

Task 3: Technical assistance in the development of a metadata management model

March 2006

subcontractor

4,000

Task 3: Validation of the model, introduction to metadata cards

March 2006

subcontractor

4,000

Task 3: Validation of the metadacards and introduction to the cartographic management of cards

March 2006

Ladoga Telecom

4,000

Task 3: Introduction on the use of software for metadata cards management

November 2006

Mineral

4,000

Task 3: Validation of the software and MIS

November 2006

Mineral

4,000

Task 4: Satellite image processing

September 2006

Mineral

1,000

Task 4: Interpretation of satellite images

December 2006

Mineral

2,000

Task 4: Scanning of exogenous data

December 2006

Mineral

1,000

Task 4: Digitalisation of ancillary data

December 2006

Mineral

4,000

Task 4: Geo-referencing of ancillary data

December 2006

Mineral

2,000

Task 4: Development of on-line access

April 2007

Mineral

1,000

Task 4: Preparation and validation of the terms of references for the SIG and user manual

June 2006

subcontractor

8,000

Task 4: Validation and control of image pre-processing, list of exogenous data to be collected

September 2006

Mineral

4,000

Task 4: Validation of the scanning, technical specification for digitalising exogenous data

September 2006

Mineral

4,000

Task 4: Validation of land use mapping and digitalisation

December 2006

subcontractor

4,000

Task 4: Validation and test of the SIG

December 2006

subcontractor

4,000

Task 5: Computerising of indicator-based assessment; development of on-line access

March 2007

Mineral

2,400

Task 6: Training of trainers in the use of MIS

June 2006

subcontractor

8,000

Task 6: Training of trainers in the use of GIS

December 2006

Mineral (ESRI training)

8,000

Task 6: Local assistants to EU trainers in the use of GIS and MIS

April 2007

Training session (renting of equipment)

800

Total







80,200
1   ...   5   6   7   8   9   10   11   12   ...   15

Похожие:

Russia Life04tcy/ros/000xx progress Report №2 from 01. 07. 05 to 15. 01. 06 Date of the submission of the report: 20. 01. 06 iconПриложение
Вид Identification system/ Date of application of Identification number/ Date of birth

Russia Life04tcy/ros/000xx progress Report №2 from 01. 07. 05 to 15. 01. 06 Date of the submission of the report: 20. 01. 06 icon3. конкурсное задание
Организация «WorldSkills Russia» в соответствии с Уставом WorldSkills Russia, Регламентом и

Russia Life04tcy/ros/000xx progress Report №2 from 01. 07. 05 to 15. 01. 06 Date of the submission of the report: 20. 01. 06 iconО заполнении заявления в russia. Study
Т. е после заполнения он-лайн заявления-анкеты в russia. Study, а также размещения скан-копий документов (требуемых для прохождения...

Russia Life04tcy/ros/000xx progress Report №2 from 01. 07. 05 to 15. 01. 06 Date of the submission of the report: 20. 01. 06 iconВерсия документа
В данном документе описаны спецификации веб-сервисов компании Hermes Russia. Веб-сервисы компании Hermes Russia позволяют клиентам...

Russia Life04tcy/ros/000xx progress Report №2 from 01. 07. 05 to 15. 01. 06 Date of the submission of the report: 20. 01. 06 iconИ описание компетенции
Организация «WorldSkills Russia» в соответствии с Уставом WorldSkills Russia, Регламентом и Правилами конкурса, приняла следующие...

Russia Life04tcy/ros/000xx progress Report №2 from 01. 07. 05 to 15. 01. 06 Date of the submission of the report: 20. 01. 06 iconФедерация «сётокан каратэ-до интернешнл россии» shotokan karate-do...
Открытый турнир г. Москвы по всестилевому каратэ, проводятся на основании решения президиума S. K. I. F-russia и единого плана спортивных...

Russia Life04tcy/ros/000xx progress Report №2 from 01. 07. 05 to 15. 01. 06 Date of the submission of the report: 20. 01. 06 iconИ описание профессиональной компетенции
Организация «WorldSkills Russia» в соответствии с Уставом WorldSkills Russia, Регламентом и Правилами конкурса, приняла следующие...

Russia Life04tcy/ros/000xx progress Report №2 from 01. 07. 05 to 15. 01. 06 Date of the submission of the report: 20. 01. 06 iconTrade Association «vneshtechnika», Russia, hereinafter referred to as the
«Foreign Trade Association «vneshtechnika», Russia, hereinafter referred to as the "Customer" or “Client” represented by Director...

Russia Life04tcy/ros/000xx progress Report №2 from 01. 07. 05 to 15. 01. 06 Date of the submission of the report: 20. 01. 06 iconThis agreement, is made and entered into effect from the date of...

Russia Life04tcy/ros/000xx progress Report №2 from 01. 07. 05 to 15. 01. 06 Date of the submission of the report: 20. 01. 06 icon"Структура и органы управления образовательной организацией"
Под Date понимается дата утверждения/изменения/выдачи документа (формат: д м гг)

Вы можете разместить ссылку на наш сайт:


Все бланки и формы на filling-form.ru




При копировании материала укажите ссылку © 2019
контакты
filling-form.ru

Поиск