Bandar abbas steam power plant project (4x350 mw)


НазваниеBandar abbas steam power plant project (4x350 mw)
страница1/25
ТипДокументы
  1   2   3   4   5   6   7   8   9   ...   25


ISLAMIC REPUBLIC OF IRAN
MINISTRY OF ENERGY
THERMAL ELECTRIC POWER GENERATION

HOLDING COMPANY


BANDAR ABBAS STEAM POWER PLANT PROJECT (4x350 MW)

CONTRACT NO. ….
VOLUME 3/4
MISCELLANEOUS AUXILIARY PLANTS

Contractor: Technopromexport
Consultant: Ghods Niroo Engineering Company (GNEC)



ИСЛАМСКАЯ РЕСПУБЛИКА ИРАН
МИНИСТЕРСТВО ЭНЕРГЕТИКИ
ХОЛДИНГОВАЯ КОМПАНИЯ ПО ПРОИЗВОДСТВУ ЭЛЕКТРИЧЕСКОЙ ЭНЕРГИИ НА ТЕПЛОВЫХ СТАНЦИЯХ


ПРОЕКТ ТЭС «БЕНДЕР-АББАС»

(4х350 МВт)

КОНТРАКТ № …
ТОМ 3/4
ПРОЧИЕ ВСПОМОГАТЕЛЬНЫЕ СООРУЖЕНИЯ

Подрядчик: ОАО «Во «Технопромэкспорт»
Консультант: Ghods Niroo Engineering Company (GNEC)



TABLE OF VOLUMES OF CONTRACT
VOLUME 1 CONTRACT AGREEMENT, SPECIAL AND GENERAL CONDITIONS

VOLUME 2 GENERAL TECHNICAL REQUIREMENT AND SCOPE OF WORK

VOLUME 3/1 CIVIL WORKS SPECIFICATION

VOLUME 3/2 MECHANICAL WORKS SPECIFICATION

VOLUME 3/3 ELECTRICAL WORKS SPECIFICATION

VOLUME 3/4 MISCELLANEOUS AUXILIARY PLANTS

VOLUME 3/5 INSTRUMENTATION AND CONTROL WORKS

VOLUME 3/6 INSPECTION, TESTS AND COMMISSIONING

VOLUME 4/1 SCHEDULE OF PERFORMANCE DATA, SCHEDULE OF TECHNICAL INFORMATION (MECHANICAL AND MISCELLANEOUS EQUIPMENT)

VOLUME 4/2 SCHEDULE OF TECHNICAL INFORMATION (ELECTRICAL AND I/C)

VOLUME 5 DRAWINGS



СПИСОК ТОМОВ КОНТРАКТА
ТОМ 1 КОНТРАКТНОЕ СОГЛАШЕНИЕ, СПЕЦИАЛЬНЫЕ И ОБЩИЕ УСЛОВИЯ

ТОМ 2 ОБЩИЕ ТЕХНИЧЕСКИЕ ТРЕБОВАНИЯ И ОБЪЕМ РАБОТ

ТОМ 3/1 СПЕЦИФИКАЦИЯ ПО СТРОИТЕЛЬНЫМ РАБОТАМ

ТОМ 3/2 СПЕЦИФИКАЦИЯ ПО МЕХАНИКЕ

ТОМ 3/3 СПЕЦИФИКАЦИЯ ПО ЭЛЕКТРИКЕ

ТОМ 3/4 ПРОЧИЕ ВСПОМОГАТЕЛЬНЫЕ СООРУЖЕНИЯ

ТОМ 3/5 КОНТРОЛЬ И ИНСПЕКЦИЯ

ТОМ 3/6 ИНСПЕКЦИЯ, ИСПЫТАНИЯ И ПУСК

ТОМ 4/1 ГРАФИК ВЫПОЛНЕНИЯ РАБОТ, ГРАФИК ТЕХНИЧЕСКОЙ ИНФОРМАЦИИ (МЕХАНИЧЕСКОЕ И ВСПОМОГАТЕЛЬНОЕ ОБОРУДОВАНИЕ)

ТОМ 4/2 ГРАФИК ТЕХНИЧЕСКОЙ ИНФОРМАЦИИ (ЭЛЕКТРИКА И КИП)
ТОМ 5 ЧЕРТЕЖИ








List of content

page

SECTION 211

AIR CONDITIONING, HEATING, COOLING,VENTILATION AND HOT AND CHILLED WATER SYSTEM

1

SECTION 317

AUXILIARY BOILERS

37

SECTION 34

FUEL SYSTEM

43

SECTION 340

FUEL SYSTEM, GENERAL

44

SECTION 341

FUEL GAS SYSTEM

45

SECTION 342

LIQUID FUEL SYSTEM

52

SECTION 368

SAMPLING SYSTEM

65

SECTION 371

RAW WATER SUPPLY

69

SECTION 373

DESALINATION PLANT

72

SECTION 374

&375

WATER TREATMENT SYSTEM

74

SECTION 376

CHEMICAL HANDLING & STORAGE SYSTEM

85

SECTION 377

WASTE WATER AND SEWAGE TREATMENT

89

SECTION 378

CONDENSATE POLISHING PLANTSYSTEMS

95

SECTION 397

CHEMICAL DOSING SYSTEM

100




List of content

page

SECTION 428

AUXILIARY COOLING SYSTEM

103

SECTION 448

MISCELLANEOUS STORAGE TANKS

108

SECTION 584

EMERGENCY DIESEL GENERATOR UNIT

111

SECTION 72

MAINTENANCE WORKSHOP & STORE

116

SECTION 730-1

HYDROGEN GENERATING PLANT

126

SECTION 75

CRANES, HOISTING EQUIPMENT & LIFTS

135

SECTION 76

COMPRESSED AIR EQUIPMENT

153

SECTION 78

MISCELLANEOUS PUMPS

160

SECTION 791

FIRE FIGHTING SYSTEM

165

SECTION 795

CHEMICAL LABORATORY

182








Содержание

стр.

РАЗДЕЛ 211

СИСТЕМЫ КОНДИЦИОНИРОВАНИЯ ВОЗДУХА, ОТОПЛЕНИЯ, ОХЛАЖДЕНИЯ, ВЕНТИЛЯЦИИ, ХОЛОДНОГО И ГОРЯЧЕГО ВОДОСНАБЖЕНИЯ

1

РАЗДЕЛ 317

ВСПОМОГАТЕЛЬНЫЕ КОТЛЫ

37

РАЗДЕЛ 34

ТОПЛИВНАЯ СИСТЕМА

43

РАЗДЕЛ 340

ТОПЛИВНАЯ СИСТЕМА-ОБЩЕЕ

44

РАЗДЕЛ 341

СИСТЕМА ТОПЛИВНОГО ГАЗА

45

РАЗДЕЛ 342

СИСТЕМА ЖИДКОГО ТОПЛИВА

52

РАЗДЕЛ 368

СИСТЕМА ОТБОРА ПРОБ

65

РАЗДЕЛ 371

ПОДАЧА СЫРОЙ ВОДЫ

69

РАЗДЕЛ 373

ОПРЕСНИТЕЛЬНАЯ УСТАНОВКА

72

РАЗДЕЛ 374

& 375

СИСТЕМА ВОДОПОДГОТОВКИ

74

РАЗДЕЛ 376

ХИМРЕАГЕНТЫ И СИСТЕМА ХРАНЕНИЯ

85

РАЗДЕЛ 377

СБРОСНЫЕ ВОДЫ И КАНАЛИЗАЦИЯ

89

РАЗДЕЛ 378

СИСТЕМЫ КОНДЕНСАЦИОННОЙ ОЧИСТКИ

95

РАЗДЕЛ 397

СИСТЕМА ХИМИЧЕСКОГО ДОЗИРОВАНИЯ

100




List of content

page

РАЗДЕЛ 428

СИСТЕМА ОХЛАЖДЕНИЯ ДЛЯ ВСПОМОГАТЕЛЬНЫХ СИСТЕМ

103

РАЗДЕЛ 448

ПРОЧИЕ БАКИ ХРАНЕНИЯ

108

РАЗДЕЛ 584

АВАРИЙНЫЙ БЛОК ДИЗЕЛЬНОГО ГЕНЕРАТОРА

111

РАЗДЕЛ 72

МАСТЕРСКАЯ ТЕХОБСЛУЖИВАНИЯ И ХРАНЕНИЕ

116

РАЗДЕЛ 730-1

ВОДОРОДОГЕНЕРИРУЮЩАЯ УСТАНОВКА

126

РАЗДЕЛ 75

КРАНЫ, ПОДЪЕМНЫЕ МЕХАНИЗМЫ И ЛИФТЫ

135

РАЗДЕЛ 76

ОБОРУДОВАНИЕ СЖАТОГО ВОЗДУХА

153

РАЗДЕЛ 78

ПРОЧИЕ НАСОСЫ

160

РАЗДЕЛ 791

ПРОТИВОПОЖАРНАЯ СИСТЕМА

165

РАЗДЕЛ 795

ХИМИЧЕСКАЯ ЛАБОРАТОРИЯ

182



SPECIFICATION
SECTION 211 - AIR CONDITIONING, HEATING, COOLING,

VENTILATION AND HOT

AND CHILLED WATER SUPPLY SYSTEMS



СПЕЦИФИКАЦИЯ
РАЗДЕЛ 211 - СИСТЕМЫ КОНДИЦИОНИРОВАНИЯ ВОЗДУХА, ОТОПЛЕНИЯ,

ОХЛАЖДЕНИЯ, ВЕНТИЛЯЦИИ, ХОЛОДНОГО И ГОРЯЧЕГО ВОДОСНАБЖЕНИЯ





1. Air Conditioning, heating and ventilation system.

The purpose of this specification is to define the basis of design of the heating, ventilation and air conditioning systems to serve the buildings of the thermal Power Plants.

1.1. Standard and codes.

Standards and Codes (latest Revision issued at the signing date of the contract) shall be applied in Design, fabrication and testing

  • Carrier - Handbook of air conditioning system design.

  • ASHRAE - American Society of Heating Refrigerating and Air Conditioning Engineers



  • Handbook of fundamental

  • IEC - International Electro technical Commission.

  • SMACNA - Sheet Metal and Air Condition Contractors National Association

• NFPA - National Fire Protection Association

NFPA 90A - Standard for the installation of air conditioning and Ventilating system.

• ISO - International standard organization

ISO/40 Measuring of acoustic inside rooms and for framing Elements

• ARI - Air Conditioning and Refrigeration Institute

• AFI - American Filtering Institute

• ADC - Air Diffusion Council

• EN8086 - Standard for Air Handling Unit construction - Materials

• ASTM - American Society for Testing and Materials (Material specification)

• DIN - Deutsches institut fur Normug (Material specification)

  • RF – Russian Standards

Other equivalent standard as approved by Engineer.

  1. Site condition.

Air conditioning, heating and ventilation system shall be used to serve the are a sand types as tabulated herein below.

Outdoor and indoor design conditions shall be as follows:

A. Outdoor design conditions:




Parameters


Purpose

Heating

Venti-lation

Air Conditioning

1

Design temperature in winter,C

+7,5

+7,5

+7,5

2

Design temperature in summer C

-

+40,6

+40,6

3

Relative humidity in Winter%

-

-

80

4

Relative humidity in summer %

-

-

57,5





Climatic data for air conditioning, heating and cooling systems design must provided By the customer.

B-Indoor Design Condition


Type

Dry Bulb Temp.,C

HVAC type

Relative Humidity at design condition,%

Pressuriza-tion




Summer

Winter










A

24 ± 1

22 ± 1

A/C

40-60

P

B

Max. 40

Min.16

H/V/Cooling(above Max. 40)

-

P

C

Max.40

Min.10

H/V/Cooling NOTE 1

-

N

D

T=4°C above outside design

temperature

Min.10

H/V

-

N

E

33

Min. 16

H/V/Cooling (above Max. 33)

-

P

F

28

Min.16

A/C&V

-

P

G

max.33

Min.16

A/C

40-60

P

H

28

Min.16

A/C

40-60

P

I

T £ outside design

Temperature

-

V

-

N





Note 1: Cooling system to be considered. The maximum summer temperature shall be 43 degrees Centigrad for design of cooling system.

A/C - Air conditioning

H : Heating

V : ventilation

"A" Type: Control rooms (central, substation , offices of water treatment plant, liquid fuel oil handling),computer rooms, relay rooms , shift engineer rooms and offices of control room, offices of administration building, I&C laboratory, sampling room, clinic, fuel truckdriver, guard tower, training building, gatheringhall.

"B" Type: Switchgear rooms, fire station, store, chemical storage room, HVAC machine room, locker room, water and waste water treatment buildings, battery rooms, battery charger rooms.

Note: The pressurization for battery rooms & battery charger rooms shall be negative.

"C" Type: Turbine House, compressor room, H2 plant, Diesel/Generator house, auxiliary CW Pumphouse.

"D" Type: Main & Auxiliary Boiler houses(for indoor), Main CW Pumphouse, fuel oil pumphouse.

"E" Type: Workshop

"F" Type: Canteen and restaurant

"G" Type: Chemical Laboratory

"H" Type: Guard house, security house

"I" Type: Cable flats, Toilets, Central heating mechanical room

The Contractor shall supply the followings:

a) The air conditioning system with all ancillary equipment (Air handling equipment, ducting, gratings, dampers, cooling, heating coils, etc.)

b) Hot water supply system in areas "A" to "I"

c) Heating, cooling and ventilation equipment, properly insulated, supply and return ducting as well as piping

d) Supporting (equipments, ducts, pipes, etc), wherever is necessary.

Notes:

- A minimum quantity of outside air shall be provided at the rate of 0.00125m3/sec per m2 of floor area in each room (Outside fresh air to be introduced in the supply ducting by air handling unit).

- The air exchange to be provided according to Ashrae standard.

- The air conditioning of all electronic equipment rooms shall be interlocked with the fire detection system such that the air conditioning is switched off on detection of fire
  1   2   3   4   5   6   7   8   9   ...   25

Похожие:

Bandar abbas steam power plant project (4x350 mw) iconЛабораторная работа №1 Принципы Управления проектами с использованием microsoft project 6
Управление проектами с помощью Microsoft Project: Методические указания к лабораторной работе по дисциплине «Основы организационного...

Bandar abbas steam power plant project (4x350 mw) iconЛабораторная работа №1 Запуск и настройка Microsoft Project. Справочная система

Bandar abbas steam power plant project (4x350 mw) iconIran thermal electric power generation

Bandar abbas steam power plant project (4x350 mw) iconThermal electric power generation
Том 4/1 Ведомость технических характеристик, Перечень технической информации (механического и прочего оборудования)

Bandar abbas steam power plant project (4x350 mw) iconКласс Фамилия Имя Отчество
Форма представления (Макет/ чертежи/ презентация Power Point/ люительсктй фильм/ мультфильм или другое)

Bandar abbas steam power plant project (4x350 mw) iconReliable dc power Over Existing Category 5 Cabling
Поддерживает беспроводные точки доступа d-link или аналогичные системы с питанием от постоянного тока 5 в или 12 В

Bandar abbas steam power plant project (4x350 mw) iconФактор четыре
Российского фонда фундаментальных исследований (проект 99-06-87107) в рамках программы Центрально-Европейского университета «Translation...

Bandar abbas steam power plant project (4x350 mw) iconКонкурсная документация
Для справок обращаться к Организатору конкурса: ведущему специалисту отдела управления закупками Урываевой Евгении Владимировне,...

Bandar abbas steam power plant project (4x350 mw) iconРуководство по проведению тренинга «Эффективная коммуникация»
Приветствие. Представление тренера, темы и целей тренинга. Тема и цели тренинга могут быть заранее зафиксированы на флип-чарте или...

Bandar abbas steam power plant project (4x350 mw) iconПрезентация должна содержать следующие обязательные разделы
Для участия во 2-ом заочном этапе Вам необходимо прикрепить файл (в формате ms power Point) с описанием Вашей научной работы в личном...

Вы можете разместить ссылку на наш сайт:


Все бланки и формы на filling-form.ru




При копировании материала укажите ссылку © 2019
контакты
filling-form.ru

Поиск